![]() Engineer Adly Ayoub was a pioneer in this sector and held the position of Chairman for Speco Co., which was credited with using the most advanced techniques available to obtain the best project results.Įngineer Ayoub Adly Ayoub, the eldest son of Engineer Adly Ayoub, graduated from the Faculty of Engineering in 1974. Shahnaz Al Mahdi (with Boutros Ghali, Francophonie sec-gen during Mitterand. In 1976 he established an Egyptian-Swiss joint venture company, which was granted the construction contract for the Ramsis Hilton Hotel. Al Azhar University is a university in Cairo, Egypt. ![]() of the posh Coutarrelli building overlooking the smart Saba Pasha district. ATurkishpoliceofficerstandsnexttothebodyoftheyoungboy-Reuters Mubarak referred to her new movie The Guest: Aleppo. 3 Cairo - Belbeis Desert Road, El-Nahda, Second Al Salam Cairo Egypt. At that time, the Hilton Hotel was to be the tallest building in Cairo and despite this impressive first, using the most advanced construction techniques, the company completed the project in a period of 36 months.Īfter the completion of the Ramses Hilton, Engineer Ayoub started several independent projects. In 1981 he changed the name of the company to Ayoubco S.A.E. During the same period, the company was granted several contracts for the construction of residential towers, bridges, airports, roads, sewage disposals, water networks and telecommunication services. ![]() In addition to the infrastructure and residential projects, Ayoubco started building military townships and tourist-related projects. EL YOUM EL SABAA NEWSPAPER is located in Giza, Egypt. Since then, Ayoubco has become one of the largest contracting companies in Egypt.Ĭurrently, Ayoubco trades as a contractor to Remco and the Egyptian Armed Forces. Company is working in Advertising, Newspaper publishers business activities.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |